7bis
Buttes Chaumont

This is one of the deepest stations on the network, with the platforms being 28.7 metres below surface level. This section of line was quite difficult to construct, as this area was used for gypsum excavations, and the tunnels had to be constructed in the huge caverns left behind.

©2005-2015 Richard Whittaker - Milestone Concorde - Please report any bugs on GitHub